GIRSANG, DESY ANNISA and Pasra, Nurmiati (2018) PENGARUH MANUVER JARINGAN PADA SALURAN KABEL TEGANGAN MENENGAH DENGAN MENGGUNAKAN REMOTE CONTROL. Diploma thesis, ITPLN.
COVER LAPORAN.pdf
Download (78kB)
Lembar Pengesahan.pdf
Download (3MB)
abstrak, daftar isi fix.pdf
Download (330kB)
BAB I bismillah no revisi.pdf
Download (96kB)
BAB II bismillah no revisii.pdf
Download (225kB)
BAB III bismillah no revisi.pdf
Restricted to Registered users only
Download (393kB)
BAB IV bismillah no revisi.pdf
Restricted to Registered users only
Download (691kB)
BAB V bismillah no revisi.pdf
Restricted to Registered users only
Download (85kB)
daftar pustaka.pdf
Download (6kB)
Abstract
Dalam operasi sistem distribusi tenaga listrik 20 kV sering terjadi gangguan yang mengakibatkan terganggunya penyaluran tenaga listrik ke konsumen. Jika penyaluran tenaga listrik terganggu, maka seluruh kegiatan bisa terhenti secara keseluruhan sehingga membuat kerugian yang sangat besar. Dengan dilakukannya manuver jaringan menggunakan remote control dapat membuat durasi pemadaman menjadi lebih singkat serta membuat energi yang tidak tersalur menjadi semakin kecil. Dampak tersebut dapat dilihat dari perhitungan SAIDI dan ENS pada penyulang Bursa pada tahun 2016 yaitu 72,68 menit/pelanggan dan pada tahun 2018 sebesar 23,17 menit/pelanggan, pada penyulang Sanca tahun 2017 sebesar 41,96 menit/pelanggan menjadi 27,03 menit/pelanggan, serta pada penyulang Koros pada tahun 2016 sebesar 24,01 menit/pelanggan dan pada 2017 sebesar 14,1 menit/pelanggan. Penggunaan remote control juga dapat menyelamatkan ENS pada penyulang Bursa sebanyak 1561,24405 kWH, pada penyulang Sanca sebanyak 939,867072 kWH, dan penyulang Koros sebanyak 636,256194 kWH.
In the 20 kV electrical power distribution operating system often occure interfference caused electrical power distribution to the consumer disturbed. If the electrical power is disturbed, accordingly all kind of activity would stoped as so make big lossing. By apply network maneuver with remote control could reduce power outage duration and decrees energy that is not distributed. That impact appear of SAIDI and ENS at Bursa feeder calculation on 2016 with 72.68 minutes/customer and 23.17 minutes/customer on 2018, 41.96 minutes/customer become 27.03 minutes/customer at Sanca feeder calculating on 2017, and at Koros feeder we could find on 2016 with 24.01 minutes/customer and 14.1 minutes/customer on 2017. Application of remote control could save ENS on Bursa feeder amount 1561,24405 kWH, 939,867072 kWH on Sanca feeder, and 636,256194 on Koros feeder.
| Item Type: | Thesis (Diploma) |
|---|---|
| Uncontrolled Keywords: | Maneuver, Spindle system, Remote control, GFD manuver, sistem spindel, remote control, GFD |
| Subjects: | Skripsi Bidang Keilmuan > Teknik Elektro |
| Divisions: | Vokasi > D3 Teknologi Listrik |
| Depositing User: | Sudarman |
| Date Deposited: | 19 Feb 2026 06:12 |
| Last Modified: | 19 Feb 2026 06:12 |
| URI: | https://repository.itpln.ac.id/id/eprint/5118 |
