PENYETELAN RELAI ARUS LEBIH PADA PENYULANG KUKANG DAN CBO MA75 TERHADAP GANGGUAN HUBUNG SINGKAT DI GARDU INDUK SEPATAN

MUSTARI, RAHMA ANDINA and Hasanah, Aas Wasri (2018) PENYETELAN RELAI ARUS LEBIH PADA PENYULANG KUKANG DAN CBO MA75 TERHADAP GANGGUAN HUBUNG SINGKAT DI GARDU INDUK SEPATAN. Diploma thesis, ITPLN.

[thumbnail of Cover.pdf] Text
Cover.pdf

Download (183kB)
[thumbnail of lembar pengesahan.pdf] Text
lembar pengesahan.pdf

Download (229kB)
[thumbnail of Abstrak indo.pdf] Text
Abstrak indo.pdf

Download (16kB)
[thumbnail of Abstrak Inggris.pdf] Text
Abstrak Inggris.pdf

Download (83kB)
[thumbnail of BAB I.pdf] Text
BAB I.pdf

Download (272kB)
[thumbnail of BAB II.pdf] Text
BAB II.pdf

Download (267kB)
[thumbnail of BAB III.pdf] Text
BAB III.pdf
Restricted to Registered users only

Download (407kB)
[thumbnail of BAB IV.pdf] Text
BAB IV.pdf
Restricted to Registered users only

Download (295kB)
[thumbnail of BAB V.pdf] Text
BAB V.pdf
Restricted to Registered users only

Download (82kB)
[thumbnail of DAFTAR PUSTAKA.pdf] Text
DAFTAR PUSTAKA.pdf

Download (87kB)

Abstract

Gangguan hubung singkat sering terjadi pada jaringan 20 kV, antar fasa (3 fasa atau 2 fasa) atau gangguan hubung singkat satu fasa ketanah. Gangguan hubung singkat fasa ketanah dan fasa-fasa merupakan salah satu permasalahan yang mungkin timbul dalam pengoperasian di sebuah Gardu Induk. Gangguan yang disebabkan oleh adanya hubung singkat menimbulkan banyak kerugian, kerugian pada sistem jaringan distribusi maupun kerugian di pihak konsumen energi listrik. Salah satu cara untuk mengatasi gangguan ini adalah dengan menyetel relai pengaman dengan sebaik mungkin salah satunya adalah relai arus lebih. Proyek akhir ini membahas mengenai penyetelan relai arus lebih pada penyulang kukang dan cbo ma75 terhadap gangguan hubung singkat di gardu induk sepatan. Berdasarkan data dan uraian yang telah dibahas, arus hubung singkat di penyulang Kukang yang paling besar adalah 3 fasa dengan lokasi gangguan 1% sebesar 8266,87 Ampere sedangkan arus gangguan hubung singkat di cbo sebesar 6520,57 Ampere. Untuk waktu setelan relai pada cbo= 0,138 detik, dan pada penyulang kukang =0,347 detik.

Short circuit disturbances often occur on a 20 kV network, between phases (3 phases or 2 phases) or single phase ground faults. Phase short circuit faults in the ground and phases are one of the problems that may arise in the operation of a substation. Disturbances caused by the short circuit cause a lot of losses, losses in the distribution network system and losses in the consumer of electricity. One way to overcome this disorder is to set the safety relay as well as possible, one of which is overcurrent relays. This final project discusses the adjustment of overcurrent relays on slow loris feeders and CBO ma75 to short circuit disturbances at the standard substation. Based on the data and descriptions that have been discussed, the largest short circuit current in slow loris feeders is 3 phases with a 1% disturbance location of 8266.87 Ampere while the short circuit fault current in cbo is 6520.57 Ampere. For relay setting time on cbo = 0.138 seconds, and on slow loris feeder = 0.347 seconds.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: Overcurrent Relays, Adjustment of overcurrent relays. Relai Arus Lebih, Penyetelan relai arus lebih.
Subjects: Skripsi
Bidang Keilmuan > Teknik Elektro
Divisions: Vokasi > D3 Teknologi Listrik
Depositing User: Sudarman
Date Deposited: 19 Feb 2026 07:22
Last Modified: 19 Feb 2026 07:22
URI: https://repository.itpln.ac.id/id/eprint/5133

Actions (login required)

View Item
View Item