SUMANTRI, PUJI REJA and Ispranyoto, Edy (2017) PERHITUNGAN KAPASITAS TRAFO UNIT STATION TRANSFORMATOR DAN UNIT AUXILLIARY TRANSFORMATOR PADA INSTALASI PEMAKAIAN SENDIRI UNIT 2 DI PT. INDONESIA POWER UPJP KAMOJANG. Diploma thesis, ITPLN.
1. Cover.pdf
Download (49kB)
02. EMBEL-EMBEL TA HALAMAN 1-7 NICE.pdf
Download (158kB)
BAB I berkah.pdf
Download (50kB)
BAB 2 berkah.pdf
Download (1MB)
BAB 3 berkah.pdf
Restricted to Registered users only
Download (64kB)
BAB 4 insyaallah berkah.pdf
Restricted to Registered users only
Download (480kB)
BAB 5 berkah.pdf
Restricted to Registered users only
Download (79kB)
DAFTAR PUSTAKA berkah.pdf
Download (97kB)
Abstract
Proyek akhir ini membahas tentang perhitungan kapasitas trafo pada instalasi pemakaian sendiri di pembangkit UPJP Kamojang. Bertujuan untuk mengetahui alur instalasi pemakaian sendiri, menghitung kapasitas dan beban pada trafo pemakaian sendiri. PLTP merupakan pembangkit listrik yang menggunakan tenaga dari panas bumi berupa uap sebagai sumber energinya untuk mengerakan turbin. Sistem kelistrikan untuk pemakaian sendiri berfungsi untuk menyuplai tenaga listrik yang diperlukan untuk instalasi pemakaian sendiri, baik dalam kondisi beroperasi maupun tidak beroperasi. Instalasi pemakaian sendiri bekerja pada saat unit pembangkit mati atau gangguan dan pada saat peralatan utama di pembangkit ingin melakukan start awal maka diperlukan suplai daya untuk menjalankan peralatan bantu pertama kali, maka suplai daya listrik dapat didapatkan dari transformator pemakaian sendiri diambil dari jaringan interkoneksi. Metode yang dipakai dalam penelitian ini adalah kuantitatif. Dapat diketahui total kapasitas beban yang tersuplai oleh T23 sebesar 884,3 kVA pada beban satu dan 446,3 pada beban dua. Sedangkan untuk kemampuan kapasitas trafo T23 didapatkan nilai sebesar 1663,1 kVA, maka digunakan trafo dengan kapasitas 1,75 MVA, karena kemungkinan adanya penambahan beban dan start motor memerlukan kapasitas trafo yang lebih besar. Untuk trafo T22 didapatkan total beban suplai sebesar 1882,3 kVA, sedangkan untuk kemampuan kapasitas trafo T22 didapatkan nilai sebesar 2352,8 kVA maka digunakan trafo dengan kapasitas 4 MVA, karena kemungkinan adanya penambahan beban dan start motor memerlukan kapasitas trafo yang lebih besar. Jadi total kapasitas T22 adalah pejumlahan antara T23 dan beban pada T22. Jadi, kapasitas 4 MVA tersebut digunakan untuk menuplai beban-beban pada PLTP Kamojang.
This final project discusses the transformer capacity calculation on the installation of own use at UPJP Kamojang plant. Aims to know the flow of the installation itself, calculate the capacity and load on the transformer own use. PLTP is a power plant that uses the power of geothermal steam as a source of energy to build turbines. The electrical system for its own use serves to supply the electricity required for the installation of its own use, either in operational or non-operating conditions. The self-use installations work when the power plant is off or disturbing and when the main equipment at the plant wants to start the power supply is required to run the first auxiliary equipment, the power supply can be obtained from the transformer itself taken from the interconnection network. The method used in this research is quantitative. It is known that the total load capacity supplied by T23 is 884.3 kVA at load one and 446.3 at load two. As for the capacity of the transformer capacity T23 obtained value of 1663.1 kVA, then used transformer with a capacity of 1.75 MVA, because the possibility of additional load and start the motor requires a larger transformer capacity. For the transformer T22 obtained total supply load of 1882.3 kVA, while for the capacity of the transformer T22 obtained value of 2352.8 kVA then used a transformer with a capacity of 4 MVA, because the possibility of adding the load and start the motor requires a larger transformer capacity. So, capacity total ofT22 is added betwen T23 and loaded of T22. So, capacity is 4 MVA is used for suply some loads of PLTP Kamojang.
| Item Type: | Thesis (Diploma) |
|---|---|
| Uncontrolled Keywords: | Installation of own electricity, transformer capacity, start start Instalasi kelistrikan pemakaian sendiri, kapasitas trafo, start awal |
| Subjects: | Skripsi Bidang Keilmuan > Teknik Elektro |
| Divisions: | Vokasi > D3 Teknologi Listrik |
| Depositing User: | Sudarman |
| Date Deposited: | 24 Feb 2026 07:29 |
| Last Modified: | 24 Feb 2026 07:29 |
| URI: | https://repository.itpln.ac.id/id/eprint/5244 |
