Putri, Inayah Ananda and Sepriyanna, Irma (2026) Analisis Percepatan Waktu dan Biaya Pada Proyek Pembangkit Listrik Menggunakan Metode Time Cost Trade Off (TCTO) dan Critical Path Method (CPM) (Inayah Ananda Putri 202221011). Diploma thesis, Institut Teknologi PLN.
202221011_INAYAH ANANDA PUTRI_ SKRIPSI COVER.pdf
Download (129kB)
202221011_INAYAH ANANDA PUTRI_ SKRIPSI LEMBAR PENGESAHAN.pdf
Download (623kB)
202221011_INAYAH ANANDA PUTRI_ SKRIPSI ABSTRAK.pdf
Download (173kB)
202221011_INAYAH ANANDA PUTRI_ SKRIPSI BAB I.pdf
Download (218kB)
202221011_INAYAH ANANDA PUTRI_ SKRIPSI BAB II.pdf
Download (608kB)
202221011_INAYAH ANANDA PUTRI_ SKRIPSI BAB III.pdf
Restricted to Registered users only
Download (344kB)
202221011_INAYAH ANANDA PUTRI_ SKRIPSI BAB IV.pdf
Restricted to Registered users only
Download (2MB)
202221011_INAYAH ANANDA PUTRI_ SKRIPSI BAB V.pdf
Restricted to Registered users only
Download (188kB)
202221011_INAYAH ANANDA PUTRI_ SKRIPSI DAFTAR PUSTAKA.pdf
Download (194kB)
202221011_INAYAH ANANDA PUTRI_ SKRIPSI FULL.pdf
Restricted to Registered users only
Download (3MB)
Abstract
Proyek pembangunan pembangkit listrik terdiri atas berbagai kegiatan yang saling berkaitan sehingga memerlukan perencanaan dan pengendalian waktu serta biaya yang tepat. Penelitian ini bertujuan untuk menganalisis jadwal proyek, mengidentifikasi kegiatan yang berada pada jalur kritis, mengevaluasi pengaruh penambahan satu dan dua jam kerja lembur, serta menentukan alternatif percepatan yang optimal berdasarkan keseimbangan antara durasi dan biaya proyek. Penelitian ini menggunakan metode kuantitatif dengan pendekatan deskriptif analitis berdasarkan data sekunder. Penjadwalan proyek dianalisis menggunakan Critical Path Method (CPM), sedangkan percepatan proyek dievaluasi menggunakan metode Time–Cost Trade-Off (TCTO) yang diterapkan pada 13 kegiatan kritis terpilih. Analisis dilakukan dengan membandingkan kondisi normal dan kondisi setelah percepatan untuk mengetahui pengurangan durasi, kenaikan biaya, serta kelayakan setiap alternatif terhadap denda keterlambatan proyek. Hasil analisis CPM menunjukkan bahwa durasi proyek berdasarkan jadwal jaringan kerja adalah 218 minggu atau setara dengan 1.308 hari kerja, dengan biaya normal proyek sebesar Rp705.607.808.405,00. Penambahan satu jam kerja lembur mengurangi durasi proyek sebanyak 117 hari atau 8,94% menjadi 1.191 hari kerja, dengan kenaikan biaya bersih sebesar Rp1.511.767.183,57 atau 0,21%, sehingga total biaya proyek menjadi Rp707.119.575.588,57. Sementara itu, penambahan dua jam kerja lembur mengurangi durasi proyek sebanyak 192 hari atau 14,68% menjadi 1.116 hari kerja, tetapi menyebabkan kenaikan biaya bersih sebesar Rp3.713.628.060,00 atau 0,53%. Berdasarkan perbandingan antara biaya percepatan dan denda keterlambatan sebesar Rp4.395.442.050,00, penambahan satu jam kerja lembur merupakan alternatif yang optimal dan paling ekonomis karena mampu mempercepat penyelesaian proyek dengan tambahan biaya yang lebih rendah daripada denda keterlambatan yang berlaku sesuai dengan kondisi proyek yang dianalisis secara efektif dan efisien.
Power plant construction projects consist of various interrelated activities that require effective planning and control of both time and cost. This study aims to analyze the project schedule, identify activities on the critical path, evaluate the effects of adding one and two hours of overtime work, and determine the optimal acceleration alternative based on the balance between project duration and cost. This study employed a quantitative method with a descriptive analytical approach using secondary data. Project scheduling was analyzed using the Critical Path Method (CPM), whereas project acceleration was evaluated using the Time–Cost Trade-Off (TCTO) method applied to 13 selected critical activities. The CPM analysis indicated that the project duration based on the network schedule was 218 weeks, equivalent to 1,308 working days, with a normal project cost of IDR 705,607,808,405.00. Adding one hour of overtime reduced the project duration by 117 days, or 8.94%, to 1,191 working days, with a net cost increase of IDR 1,511,767,183.57, or 0.21%, resulting in a total project cost of IDR 707,119,575,588.57. Meanwhile, adding two hours of overtime reduced the project duration by 192 days, or 14.68%, to 1,116 working days, but resulted in a net cost increase of IDR 3,713,628,060.00, or 0.53%. Based on the comparison between acceleration costs and the delay penalty of IDR 4,395,442,050.00, the addition of one hour of overtime was identified as the optimal and most economical alternative because it accelerated project completion while maintaining an additional cost lower than the applicable delay penalty under the specified project conditions.
| Item Type: | Thesis (Diploma) |
|---|---|
| Uncontrolled Keywords: | critical path method, time cost trade off, percepatan proyek, waktu, biaya critical path method, time–cost trade-off, project acceleration, time, cost |
| Subjects: | Bidang Keilmuan > Construction Engineering and Management Bidang Keilmuan > Cost Analysis Bidang Keilmuan > Cost Management Bidang Keilmuan > Teknik Sipil Bidang Keilmuan > Manajemen Konstruksi Bidang Keilmuan > Project management Skripsi |
| Divisions: | Fakultas Teknologi Infrastruktur dan Kewilayahan > S1 Teknik SIpil |
| Depositing User: | FAK FTIK FTIK |
| Date Deposited: | 26 Aug 2026 07:15 |
| Last Modified: | 26 Aug 2026 07:15 |
| URI: | https://repository.itpln.ac.id/id/eprint/7282 |