Items where Subject is "Construction Engineering and Management"

Group by: Creators | Item Type
Jump to: A | H | K | P | R | S | Y | Z
Number of items at this level: 16.

A

Aina, Insani Qori and Hidayat, Wiza (2025) PERENCANAAN IMPLEMENTASI BUILDING MANAGEMENT SYSTEM UNTUK GEDUNG PERKANTORAN PLN DI INDONESIA. Diploma thesis, Institut Teknologi PLN.

Aqilah, A.Nurul and Hayati, Kemala (2026) PERANCANGAN MODEL MANAJEMEN PROYEK REKONSTRUKSI INFRASTRUKTUR PASCABENCANA HIDROMETEOROLOGI BERBASIS DEMATEL (A.NURUL AQILAH_202221022). Diploma thesis, Institut Teknologi PLN.

Ayuva, Yudith Nadhira and Hayati, Kemala (2026) KOMPARASI PERFORMANCE PROYEK BERDASARKAN METODE EARNED VALUE MANAGEMENT (EVM) DAN EARNED SCHEDULE (ES) PADA PROYEK X (YUDITH NADHIRA AYUVA_202221009). Diploma thesis, Institut Teknologi PLN.

H

Handayasari, Indah and Kusumastuti, Dyah Pratiwi and Nur Chairat, Arief Suardi (2022) Resistance of Modified Concrete-Wearing Course Mixture Using LDPE Polymer Against Damage Due to Water Immersion. Lecture Notes in Civil Engineering, 216. pp. 411-419. ISSN 23662557

Hansen, Seng and Rostiyanti, Susy Fatena (2024) Creating a Practical Transdisciplinary Learning in Teaching Construction Entrepreneurship. Journal of Engineering Education Transformations, 38 (2). pp. 72-84. ISSN 23492473

Hansen, Seng and Rostiyanti, Susy Fatena and Septaria, Dian (2024) Negotiating Construction Change Order Claims. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 16 (2). ISSN 19434162

K

Koesalamwardi, Ario B. and Rostiyanti, Susy F. and Ramadani, Khairunnisa R. (2024) Contributing factors of indoor environmental quality – Preliminary study. AIP Conference Proceedings, 2891 (1): 060009. ISSN 0094243X

P

Putri, Inayah Ananda and Sepriyanna, Irma (2026) Analisis Percepatan Waktu dan Biaya Pada Proyek Pembangkit Listrik Menggunakan Metode Time Cost Trade Off (TCTO) dan Critical Path Method (CPM) (Inayah Ananda Putri 202221011). Diploma thesis, Institut Teknologi PLN.

R

Rahadian, Aldy and Hidayat, Imron (2026) STRATEGI PERCEPATAN PROSES KONTRAKTUAL DI PLN DENGAN MENERAPKAN KONTRAK PAYUNG (MASTER SERVICE AGREEMENT) (STUDI KASUS: PENERAPAN KONTRAK PAYUNG (MASTER SERVICE AGREEMENT) DI PLN). Diploma thesis, Institut Teknologi PLN.

S

Saad, Nurunnashiha and Hayati, Kemala (2026) SISTEM MANAJEMEN RISIKO PERUBAHAN IKLIM LINGKUNGAN DI SEKTOR KONSTRUKSI DENGAN MENGGUNAKAN BOOTSTRAP ANALYTIC HIERARCHY PROCESS UNTUK PENCAPAIAN TUJUAN PEMBANGUNAN BERKELANJUTAN (SDGs). Masters thesis, Institut Teknologi PLN.

Setyasnomo, Mohammad Hafiz and Hidayat, Imron (2026) STRATEGI PEMENUHAN KEBUTUHAN TENAGA AHLI DALAM PROSES PENGADAAN PROYEK DENGAN PEMBERI KERJA/OWNER DI PT PLN ENJINIRING. Diploma thesis, Institut Teknologi PLN.

Sihombing, Andre Jupiter and Hayati, Kemala (2026) ANALISIS PENYEBAB CONTRACT CHANGE ORDER (CCO) PADA PROYEK KONSTRUKSI PEMBANGUNAN RUMAH SAKIT JANTUNG DAN PEMBULUH DARAH HARAPAN KITA JAKARTA BARAT. Diploma thesis, Institut Teknologi PLN.

Solekhah, Neneng Agustien and Hayati, Kemala (2026) STRATEGI MITIGASI RISIKO KLAIM UNFORESEEABLE PHYSICAL CONDITION MENGGUNAKAN PENDEKATAN BAYESIAN NETWORK DAN MONTE CARLO SIMULATION (STUDI KASUS: PT MRT JAKARTA) (NENENG AGUSTIEN SOLEKHAH_202221033). Diploma thesis, Institut Teknologi PLN.

Suro, Sajiharjo Marto and Bakar, I and Sulaeman, A (2016) Pile Spacing Optimization of Short Piled Raft Foundation System for Obtaining Minimum Settlement on Peat. IOP Conf. Series: Materials Science and Engineering, 136: 012033.

Y

Yunani, Amie Fatimah and Sepriyanna, Irma (2026) ANALISIS FAKTOR PENYEBAB COST OVERRUN MENGGUNAKAN METODE FAULT TREE ANALYSIS (FTA) PADA PROYEK PLTGU (AMIE FATIMAH YUNANI_202221013). Diploma thesis, Institut Teknologi PLN.

Z

Zikri F, Fernando Insani and Sepriyanna, Irma (2024) ANALISIS PENERAPAN SISTEM MANAJEMEN MUTU TERHADAP KERUSAKAN STRUKTUR KOLOM DAN BALOK PADA PROYEK HOTEL GELORA MARRIOTT. Diploma thesis, ITPLN.

This list was generated on Fri Aug 28 05:21:38 2026 WIB.