ANALISIS FAKTOR CONSTRUCTION WASTE TIME DENGAN METODE VALUE STREAM MAPPING PADA PEKERJAAN KOLOM DAN SHEARWALL GEDUNG BERTINGKAT (Studi Kasus : Proyek Apartemen Alexandria Tower, Silk Town, Serpong Utara, Tangerang Selatan)

Purwanda, Nur Widia and Hastanto, Hastanto (2018) ANALISIS FAKTOR CONSTRUCTION WASTE TIME DENGAN METODE VALUE STREAM MAPPING PADA PEKERJAAN KOLOM DAN SHEARWALL GEDUNG BERTINGKAT (Studi Kasus : Proyek Apartemen Alexandria Tower, Silk Town, Serpong Utara, Tangerang Selatan). Diploma thesis, ITPLN.

[thumbnail of 1. COVER.docx] Text
1. COVER.docx

Download (48kB)
[thumbnail of 2.LEMBAR PENGESAHAN.docx] Text
2.LEMBAR PENGESAHAN.docx

Download (36kB)
[thumbnail of BAB I.docx] Text
BAB I.docx

Download (24kB)
[thumbnail of BAB II.docx] Text
BAB II.docx

Download (147kB)
[thumbnail of BAB III.docx] Text
BAB III.docx

Download (116kB)
[thumbnail of BAB IV.docx] Text
BAB IV.docx

Download (119kB)
[thumbnail of BAB V.docx] Text
BAB V.docx

Download (18kB)
[thumbnail of DAFTAR PUSTAKA.docx] Text
DAFTAR PUSTAKA.docx

Download (16kB)
[thumbnail of DAFTAR RIWAYAT HIDUP.docx] Text
DAFTAR RIWAYAT HIDUP.docx

Download (43kB)

Abstract

Kegiatan proyek konstruksi merupakan suatu kegiatan yang berlangsung dalam jangka waktu terbatas dan alokasi sumber daya tertentu. Salah satu permasalahan yang sering terjadi adalah tidak efisienannya dan pemborosan (waste) dalam pelaksanaan konstruksinya. Salah satunya adalah waste time pada proyek konstruksi dan faktor-faktor penyebabnya dapat diidentifikasi, maka waste time yang terjadi selama pelaksanaan proyek konstruksi dapat dikurangi, sehingga tujuan dari proyek konstruksi dapat terlaksana dengan baik.Tujuan dari pengamatan ini untuk mengetahui besar waste time (pemborosan waktu) yang terjadi pada pekerjaan kolom dan shearwall berdasarkan analisa perhitungan value stream mapping serta mengetahui waktu normal pekerjaan. Kemudian mengetahui besar %allowance waste time terhadap pekerjaan kolom dan shearwall, serta langkah penanganan yang dapat diambil terhadap waste time pada pekerjaan tersebut. Data yang diambil sebanyak 15 sampel data pada setiap pekerjaan kolom dan shearwall.Dari pengamatan ini dihitung berdasarkan metode value stream mapping kemudian dikelompokkan waste time yang paling besar terjadi yaitu pada pekerjaan pembesian, pengecekan penulangan, pengecoran. Adapun, waktu standar untuk melaksanakan pekerjaan yang sebenarnya diperoleh dari perhitungan yaitu pada pekerjaan kolom sekitar 796 menit dengan asumsi 8 jam waktu kerja per-hari maka pelaksanaan normal pekerjaan kolom selama 2 hari. Sedangkan, untuk pekerjaan shearwall sekitar 1196 menit dengan asumsi 8 jam waktu kerja per-hari maka pelaksanaan pekerjaan shearwall selama 3 hari. Besar %allowance yang diperoleh pada pekerjaan kolom yaitu 37,25% dan pekerjaan shearwall sebesar 43,5%.

Construction project activity is an activity that lasts for a limited time and allocation of certain resources. One of the problems that often occur is the inefficiency and waste (waste) in the implementation of construction. One of them is waste time on the construction project and the cause factors can be identified, so waste time that occurs during the construction project can be reduced, so the purpose of the construction project can be done well.
The purpose of this observation is to know the waste time which happened on column and shearwall work based oncalculation analysis value stream mapping and to know the normal time of work. Then find out the %allowance waste time on the work of column and shearwall, and handling steps that can be taken to waste time on the job. The data were taken as many as 15 data samples on each column and shearwall work.From this observation is calculated based onmethod value stream mapping then grouped waste time the biggestthat happened at the job of pembesian, checking repetition, casting. Meanwhile, the standard time to carry out the actual work obtained from the calculation is on the column work about 796 minutes assuming 8 hours of working time per day then the normal implementation of the column work for 2 days. Meanwhile, forwork shearwall about 1196 minutes assuming 8 hours of working time per day then the implementation ofwork shearwall for 3 days. The allowance amount of earned on the column work is 37.25% and the job is shearwall 43.5%.

Item Type: Thesis (Diploma)
Uncontrolled Keywords: kolom, shearwall, waste time, value stream mapping, allowance. column, shearwall, waste time, value stream mapping, allowance.
Subjects: Bidang Keilmuan > Teknik Sipil
Skripsi
Divisions: Fakultas Teknologi Infrastruktur dan Kewilayahan > S1 Teknik SIpil
Depositing User: Sudarman
Date Deposited: 11 Sep 2025 02:53
Last Modified: 11 Sep 2025 02:53
URI: https://repository.itpln.ac.id/id/eprint/882

Actions (login required)

View Item
View Item