Adiputra, Alvin Dwi Rio and Sampurno, Sampurno (2017) PERUBAHAN ALIRAN DAYA DAN TEGANGAN AKIBAT ADANYA PERKEMBANGAN PEMBANGKIT, TRANSMISI DAN BEBAN PADA TAHUN 2018 DIBANDINGKAN PADA TAHUN 2017 DI SISTEM 500 kV PULAU JAWA. Diploma thesis, ITPLN.
Alvindwirio PDF.pdf
Restricted to Registered users only
Download (8MB)
Lampiran Lampiran.pdf
Download (1MB)
Beban Puncak 2017.pdf
Download (185kB)
Beban Ringan 2017.pdf
Download (186kB)
Beban Puncak 2018.pdf
Download (213kB)
Beban Ringan 2018.pdf
Download (214kB)
Abstract
Pembangunan Pembangkit Listrik sebanding dengan pertumbuhan beban atau pertumbuhan konsumsi listrik. Dengan adanya pembangunan Pembangkit Listrik yang semakin tahun semakin meningkat maka diperlukan penambahan unit penyaluran mulai dari penghantar sampai pada Gardu Induk, hal ini dilakukan untuk menjaga keandalan suatu sistem, mengurangi rugi - rugi dan juga menjaga masa pakai dari pengantar transmisi. Gardu Induk merupakan terminal dari sebuah sistem penyaluran dimana Gardu Induk berfungsi untuk menaikkan maupun menurunkan tegangan. Di pulau Jawa terutama bagian Barat pada tahun 2018 kebutuhan akan energi listrik semakin bertambah, untuk menjaga keandalan sistem tersebut di lakukan penambahan Pembangkit Listrik pada sistem 150 kV dan juga pada 500 kV. Dalam rangka mengimbangi antara penyedia listrik dengan permintaan kebutuhan maka dilakukan penambahan sistem Penyaluran atau Transmisi yang nantinya akan di interkoneksikan ke sistem 500 kV di Pulau Jawa dan harus diperhatikan agar penyaluran daya dari Pembangkit listrik ke pengguna listrik lebih optimal. Pada skripsi ini akan dibahas mengenai perbandingan tegangan dan aliran daya sistem 500 kV pada tahun 2017 karena adanya perkembangan sistem tenaga listrik pada tahun 2018 di Pulau Jawa. Berdasarkan hasil analisa nilai tegangan meningkat pada beban puncak maupun beban ringan dari tahun 2017 ke tahun 2018, terjadi pula perubahan nilai dan arah aliran daya di beberapa saluran sistem Jawa – Bali 500 kV.
The development of the Power Plant is proportional to the growth in the load or the growth of electricity consumption. With the development of power plants that are increasingly increasing the year is required addition of the distribution unit from the carrier to the substation, this is done to maintain the reliability of a system, reduce losses and also keep the life of the delivery introduction. Substation is the terminal of a distribution system where the substation serves to raise or lower the voltage. On the island of Java, especially the West in 2018 the need for electrical energy is growing, to maintain the reliability of the system in the addition of Power Station on 150 kV system and also at 500 kV. In order to compensate between electricity provider with demand requirement then made addition of Distribution or Transmission system which will be interconnection to 500 kV system in Java Island and must be considered for power distribution from Power plant to electric users more optimal. In this scipt will be discussed about the comparison of voltage and power flow system 500 kV in 2017 due to the development of electric power system in 2018 in Java. Based on the result of stress value analysis on peak load and light load from 2017 to 2018, there is also a change of value and direction of power flow in some channels Java-Bali system 500 kV.
| Item Type: | Thesis (Diploma) |
|---|---|
| Uncontrolled Keywords: | Aliran Daya, Pertumbuhan Konsumsi Listrik, Sistem 500 kV Pulau Jawa Power Flow, Electricity Consumption Growth, 500 kV System of Java Island |
| Subjects: | Skripsi Bidang Keilmuan > Teknik Elektro |
| Divisions: | Fakultas Ketenagalistrikan dan Energi Terbarukan > S1 Teknik Elektro |
| Depositing User: | Sudarman |
| Date Deposited: | 26 Nov 2025 13:40 |
| Last Modified: | 26 Nov 2025 13:40 |
| URI: | https://repository.itpln.ac.id/id/eprint/4120 |
